Saturday, August 31, 2013

A few permits and applications have been checked off the list

Last week was spent filling out permits, applications, and checks. We got our sellers permit, filed for our conditional use permit, filled out our TTB permit, and made an appointment for Wednesday to submit our ABC application. We also filled out our business application, but was told not to file it until we are almost open. None of it was really exciting, but it feels great to be able to cross them off our list!

By Friday, the only task we had to do was pick up our pilot system. We still need to add the pumps, organize the wires, and add a 50A circuit breaker to our control panel, but we plan hope on getting it dialed in by Wednesday so we can brew our planned recipes (originally brewed on our gas system), with our new electric system. We anticipate having better hop utilization now, so we really want to brew each of the planned recipes at least once so we can get them dialed in!


New brew stand on the left, original one on the right.

No comments:

Post a Comment